Back
to page 6
Container loading and unloading area and refinery
in back corner.
The entry to the yards for both main lines 1 and 2 just in fornt of the powerline tower.
Part of the down-grade for main line 2 on the raised track and also parts of main lines 3 and 4 on the shelf with a siding in the back.